Penn House Commons

Total Site Acreage: 25
Services:

Total site preparation management services package – Erosion & Sedimentation Controls, Clearing & Grubbing, Demolition/Crushing (Pavement, Sidewalk, Concrete Building Pads, Buildings), Sanitary Sewer, Storm Water, Soil Remediation, Wetland Mitigation, Architectural Culverts, Pressure Grouting, Guide Rail, Concrete Sidewalk, Curb, Stone Base & Paving, Striping & Signs, Site Lighting, Landscaping & Seeding

September 01, 2016
+Read more

Waynesboro Shopping Center

Total Site Acreage: 12
Services:

Total site work package – Erosion & Sedimentation Controls, Demolition (Building: 107,500 SF, Pavement, Sidewalk, & Asbestos Abatement), Storm Water Basin & Conversion, Site Excavation: 58,500 CY, Retaining Walls: 7,000 SF, Sanitary Sewer: 560 LF, Water: 220 LF, Storm Water: 1,900 LF, Concrete (Sidewalk, Loading Dock, Kiosk Pad): 8,300 SF, Fence, Guide Rail, Roof Drain: 660 LF, Curb: 6,600LF, Stone Base & Paving: 21,500 SY, Mill & Overlay Paving: 6,400 SY, Landscaping & Seeding, Line Painting, Site Lighting, HOP Work, Traffic Signalization

August 30, 2016
+Read more

Hampden Market Place

Total Site Acreage: 41
Services:

Total site development package – Erosion & Sedimentation Controls, Temporary Sediment Basins & Traps, Clearing & Grubbing, Demolition, Site Excavation:  416,000 CY, Grade Retail Pads: 9,660 SY, Sanitary Sewer: 2,050 LF, Storm Water: 5,550 LF, Water:  4,130 LF, Curb: 16,110 LF, Stone Base & Paving: 36,600 SY, Retaining Wall & Fencing: 180 LF, Detention Basin Fencing: 1,285 LF, Wooden Guide Rail: 250 LF, Concrete Sidewalk – Infills – Miscellaneous Pads: 9,800 SF, Concrete Loading Dock Pad: 4,800 SF, Line Striping & Signs, Landscaping & Seeding, Protective Bollards, Site Lighting, Electric Duct Bank

August 30, 2016
+Read more

Toigo Organic Greenhouse

Total Site Acreage: 27
Services:

Site work – Erosion & Sedimentation Controls, Clearing & Grubbing, Site Excavation: 140,300 CY, Drainage Swale:  4,000 LF, Storm Water Basins: 2, Storm Water Piping: 280 LF, Rain Garden Detention Ponds with Landscaping: 2, Irrigation Pond with Liner, Stone Parking Lot: 5,700 SY, Stone Base & Paving: 435 SY, Temporary & Permanent Seeding

October 28, 2014
+Read more

Turkey Hill

Total Site Acreage: 25
Services:

Services: Site work – Erosion & Sedimentation Controls, Clearing & Grubbing, Storm Water Basin & Sediment Trap & Conversion: 78,400 CY, Pavement Demolition: 15,000 SY, Site Excavation: 235,000 CY, Modular Concrete Retaining Walls: 50,000 SF, Sanitary Sewer: 1,200 LF, Water: 3,000 LF, Storm Water: 3,800 LF, Rain Garden, Landscaping, Fence, Guiderail, Roof Drain: 2,700 LF, Structural Excavation, Stone Placement for Building Pads and Sidewalks

October 28, 2014
+Read more

Carriage Park

Total Site Acreage: 35
Services:

Total site development services package – Erosion & Sedimentation Controls, Clearing & Grubbing, Site Excavation, Storm Water Basins, Storm Water, Sanitary Sewer, Curb, Stone Base & Paving

October 28, 2014
+Read more

The Reserve at Paxton Creek

Total Site Acreage: 12
Services:

Total Site Development – Erosion & Sedimentation Controls, Clearing & Grubbing, Site Excavation, Retaining Wall, Storm Water Basins, Storm Water, Sanitary Sewer, Curb, Stone Base & Paving

October 28, 2014
+Read more

Brooks Edge Apartments

Total Site Acreage: 6
Services:

Total site development services package – Erosion & Sedimentation Controls, Clearing & Grubbing, Demolition, Site Excavation, Retaining Walls, Storm Water Basins, Storm Water, Sanitary Sewer, Curb, Stone Base & Paving

October 28, 2014
+Read more